Skip to main content
Flooring · South Jersey

Floors that hold up.

Hardwood install and refinish, LVP for high-traffic and rentals, porcelain tile for wet rooms. Bedroom to whole house.

(609) 555-0144
  • Typical project · 1–2 weeks
  • Furniture move included
  • Dust-contained sanding

What we install and refinish

Floors are what every visitor steps on first. We install them flat, fastened right, and finished cleanly.

  • 01

    Hardwood install

    Site-finished or pre-finished. Oak, maple, hickory, walnut. Properly acclimated, glued or nailed depending on subfloor.

  • 02

    Hardwood refinish

    Sand, stain, seal. Three-coat polyurethane. Dust-containment system — much cleaner than the old-school method.

  • 03

    Luxury vinyl plank (LVP)

    High-traffic households, rental units, basements. Waterproof, scratch-resistant, fast install.

  • 04

    Porcelain & ceramic tile

    Floors, showers, backsplashes. Heated floors when you want them. Proper underlayment, every time.

  • 05

    Subfloor repair

    When the old floor comes up and the subfloor is soft, we fix it before laying anything new.

  • 06

    Stair treads & risers

    Match new floors up the stairs. Hardwood treads, painted or stained risers, custom nosing.

How a project goes

From the first call to the punch list.

Every project goes through these four phases. We don't skip steps.

01

Walkthrough

Measure, look at the subfloor, talk about the look you're after.

02

Written estimate

Material by the square foot, labor, transitions, removal of old flooring. Itemized.

03

Order & acclimate

Hardwood and LVP need 3–5 days in the house before install.

04

Install

Furniture moved, old flooring removed, new flooring installed, baseboards re-set.

What to expect.

The boring practical details — duration, lead time, payment, warranty.

Typical duration
1–2 weeks for whole-house
Lead time to start
2–4 weeks
Payment milestones
Deposit, materials delivered, final
Warranty
1-year workmanship + manufacturer warranty on materials
Recent work

A few examples.

Real project photography is being shot — placeholders for now.

Floors & tile · before
Floors & tile · in progress
Floors & tile · finished
Common questions

Questions we hear about floors & tile.

  • Can you install over the existing floor?

    Sometimes — LVP often goes over old vinyl or tile if the subfloor is sound. Hardwood usually needs old flooring removed. We'll tell you which makes sense.

  • How dusty is sanding hardwood?

    With our dust-containment system, much less than you'd expect. Not zero — but you can stay in the house, and you won't spend a week wiping down surfaces afterward.

  • Can you match my existing floor for a repair?

    For hardwood, usually yes — we can lace in new boards and re-sand the whole floor for a seamless match. For LVP and tile, depends on whether the manufacturer still makes the product.

  • What's the best floor for a rental property?

    LVP, every time. Waterproof, scratch-resistant, easy to replace a single board if a tenant damages one.

Free estimate

Ready to talk about your project?

Quick walkthrough at the property, written estimate within a business day. No pressure, no upsell.

(609) 555-0144